PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

2nd floor Interior metal framing Facing East.jpg 2nd floor Interior metal framing Facing West 2.jpg 2nd floor Interior metal framing Facing West.jpg 4th floor electrical metal framing Facing West.jpg Burned steel beam at the 1st floor Facing East.jpg Core Drilled at Stair -2.jpg Installed water return piping at the 1st floor Facing North.jpg Installing 2nd floor interior metal framing Facing West.jpg Installing sprinkler branches at the 1st floor Facing North.jpg
Previous pageNext page Burned steel beam at the 1st floor Facing East
Burned steel beam at the 1st floor Facing East